How to set up your factory working shifts

Define factory working shifts in InduSuite Settings so that WeldCloud Productivity can calculate accurate KPIs like arc time factor and utilization. Shifts control which days and hours count as production time for your site.


Prerequisites


  • An InduSuite account with access to Settings
  • At least one site already created in InduSuite


Procedure


  1. Go to Settings.



    Go to Settings
  2. Click Shifts.



    Click Shifts
  3. Click Add shift.



    Click Add shift
  4. Enter the shift name (e.g., "Morning Shift") in the Shift name field.



    Enter shift name
  5. Choose the site or sites to attach this shift to.



    Choose site
  6. Activate the workdays that apply to this shift.



    Activate workdays
  7. Set the start time and finish time for the shift.



    Set start and finish time
  8. Click Add break and enter planned break times. If the shift runs overnight, activate the Overnight checkbox.



    Add break
  9. Configure the site schedule settings as needed.



    Configure site schedule
  10. Use Sync Times to copy the current day's schedule to all active workdays.


Sync Times


  1. Click Save.